Hi
The serial number I chose is the one with posting date 9/9/2013. But the cost it used is the one with 9/10/13 posting date.
Is SAP valuating the cost by system date? It should be posting date, right?
Hi
The serial number I chose is the one with posting date 9/9/2013. But the cost it used is the one with 9/10/13 posting date.
Is SAP valuating the cost by system date? It should be posting date, right?