Hi,
Thanks for your reply.
I already maintained collective requirements as 2 in HALB2 and HALB1 level also.
In HALB2 level dependent requirements from the sales order is consuming by PIR. In our case two types of BOM is there.
FERT --> HALB1 --> HALB2
FERT --> HALB2
In the 2nd case it is working. I need the PIR should be consume by the dependent requirements with 1st case.
Please help me.
Thanks in advance.
Naren