Hi Pavan,
How do set this up. We have 3+1 ( for failover) 1TB nodes in Production and 6 512GB nodes in QA. How do we do the node mapping for DR? how does the parameter global_allocation_limit value help with it.
Thanks
Srini
Hi Pavan,
How do set this up. We have 3+1 ( for failover) 1TB nodes in Production and 6 512GB nodes in QA. How do we do the node mapping for DR? how does the parameter global_allocation_limit value help with it.
Thanks
Srini