Hi,
We have calibration inspection where inspection lots are generated for which RR and UD done and after that PM calibration orders are closed. Now due to some issue without doing RR they did UD for some inspection lots. Now they want to reverse UD then do RR and again UD.
How this can be done.
Thanks
Kumar