Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 9080

Re: BW Process Chain Descheduled

$
0
0

hi Rino Sica,

 

i hope this info will help you.

 

Terminate released jobs before the upgrade

 

By using transaction SE38 to call report BTCTRNS1 before starting the upgrade, jobs that have already been released are 'Cancelled for upgrade'.

 

  • The status of all released jobs is set to a non-standard status. That is, to a status other than planned, released, active, finished or cancelled.
  • Prior to Release 4.6, the jobs are no longer displayed in the job overview (transaction SM37). As of Release 4.6, they are displayed with status released/susp.
  • Any scheduled RDDIMPDPs (also triggered by an event) are not affected.

 

Re-releasing the jobs after the upgrade

 

To do this, call the BTCTRNS2 report after the upgrade is completed succesfully, also by using transaction SE38.


  • The jobs that BTCTRNS1 set with a special status are then restored to their original status (released).
  • All jobs suppressed before the upgrade with BTCTRNS1 are then displayed as 'Released' in the job overview (transaction SM37). This also affects RDDIMPDP jobs. There should not be more than one RDDIMPDP running in any client.

Note:

    • If there is a job that is released after the run of BTCTRNS1 and before the upgrade, this job will not be descheduled automatically.

 

Regards,
Sreekanth


Viewing all articles
Browse latest Browse all 9080

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>