Hi,
Thnx for your answer, but the question was a bit different.
I know how to set up the phantom and i have done it. But I need a setup were I will be loading forecast at the phantom level and then when creating FG demand by either S/O or forecast the system would consume the forecast of this Phantom based on the BOM requirement of the Finished good. This I cannot setup in SAP B1 and need help with. this is similar to make to order strategies with planning material in SAP R3.
Can anybody advise please?
thnx.