Hi
We are doing upgrade from SAP BO 3.1 SP3 to SAP BO 3.1 SP5, can you please help in below points
1. How much time does it take to run SP5 upgrade service pack for servers and client tools. The server need to be upgraded only on weekend, is it possible to upgrade in 1.5 days?
2. The OS is Windows 2008 server. what should be the rollback plan in case of upgrade failure ? One of server uses VM image while Production server doesnt have any VM image.
3. If BO client tools are on SP3, can they still connect to BO server components on SP5 - (for interim period when servers are upgraded first)
Thanks
anu