Hello Friends,
There is a work around for this. I have used the same rework and quarantine operations separately with each operation in main routing and assigned to reporting step the corresponding ERP operation number to which scrap confirmation should flow. This is working fine but only issue is if you "Complete" the operation in rework or quarantine then also it sends a confirmation to ECC for the main routing operation.
Need to check the POD operation if to use "Complete" or "Add Done" when logging an NC.
Thanks
K S Srinivas