Thanks Suman, that was one of our options ,but we have to transport the change Prod. I was trying my luck with what ever I have in Prod system as I had to provide a quick analysis to client.
Any ways we did manage with some math combining data from both 0TCT_C01 and 0TCT_C03 in an excel , with customer specific assumptions.
Rgds,
Prashanth